Case study — community

Electric radiators installed for Lytchett youth hall

A full heating upgrade for a village hall being turned into a local youth club — done at reduced cost to support the charity behind it.

  • The building

    Village hall becoming a local youth club

  • Heating

    12 electric radiators installed

  • Enabling work

    Electrical system upgraded to support the new heating

  • Who for

    A charity, at reduced cost to support them

The project

A hall with a new purpose, and no warmth to match it

The village hall in Lytchett had been taken over by a charity with a plan: transform it into a youth club for the local community. A building that young people are meant to spend their evenings in needs heating that actually works — reliably, and without eating the charity's funds.

Village halls are among the hardest buildings to heat well. They are big, open rooms that stand empty for most of the week and then fill for a few hours at a time — a youth club evening, a weekend booking, a committee meeting. Heating a building like that continuously wastes money warming empty space; not heating it means every session starts in the cold. And the people making the decision are almost never spending their own money: a hall runs on hire fees, grants and fundraising, so every pound that goes into heat is a pound that came from someone's effort.

That occupancy pattern is exactly what per-room electric heating is built for. Each radiator has its own thermostat and its own schedule, so the building can heat the rooms that are actually in use, when they are in use, and nothing else — warm for the hours the club runs, off for the hours it doesn't. There is no boiler to maintain, no plant room, and no single point of failure that closes the whole building.

The enabling work

First the wiring, then the warmth

Twelve radiators is a real electrical load, and an older hall's installation was never designed with electric heating in mind. Before new heating can go in, the building's electrical system has to be able to carry it safely — the supply, the distribution board and the circuits the radiators will run on.

That is what "enabling work" means on a job like this one: we upgraded the hall's electrical system so it could support the new heating properly, then installed the twelve radiators onto it. It is less visible than the radiators on the walls, and it is the part that makes them possible.

The delivered scope

  • 12 electric radiators installed through the hall
  • Electrical system upgraded to enable them
  • Full heating upgrade at reduced cost to support the charity
  • Reliable warmth for the community

Why at reduced cost

Backing the effort, not just taking the job

A charity turning a village hall into a youth club is the kind of effort that runs on goodwill — volunteers' evenings, donated materials, favours called in. We carried out the full heating upgrade at reduced cost to support them: proper work, done properly, priced so the project could afford it.

The result is what the charity needed from us: reliable warmth for the community spaces the youth club now runs in.